TransInfo

Maintenance work in the Mont Blanc Tunnel in July

You can read this article in 2 minutes
|

9.07.2020

Maintenance work will be carried out in the Mont Blanc tunnel in the coming days. Check out which days drivers should expect traffic difficulties in the tunnel.

Pavement maintenance work has been carried out near the toll booths at the Eloise, Bonneville-Est and Cluses sites (A40) from Monday, 6 July. 

  • From 8:00 Monday, 6 July to 18:00 Friday, 17 July, the right-hand exit toll lane will be closed.
  • From 8:00 Monday, 27 July to 18:00 Friday, 7 August, an exit toll lane will be closed.

A40 – At the Bonneville-Est toll station n ° 17, the right toll lane will be closed in the direction of traffic Geneva – Chamonix. Roadwork will be carried out from 15 July 2020 to 24 July 2020:

  • from 8:00 Wednesday, 15 July to 18:00, Friday, 24 July, the right-hand exit toll lane will be closed.
  • From 8:00 Wednesday, 22 July to 18:00 Thursday, 30 July, the right toll lane at the entrance will be closed. 
  • From 8:00 Wednesday, 15 July to 18:00 Friday, 24 July, the right-hand exit toll lane will be closed.
  • From 8:00 Wednesday, 22 July to 18:00 Thursday, 30 July, the right toll lane at the entrance will be closed.

During the duration of the works, all entrances and exits by this toll station remain possible via the other tracks.

Photo: Lynn Rainard/Flickr CC BY-SA 2.0

Tags