M0 motorway, Hungary - photo credits @ Beroesz, CC BY-SA 3.0, via Wikimedia Commons

Higher fines and expansion of toll roads in Hungary soon

There are serious changes coming to road toll payment in Hungary: from 16 August, toll fees will change and from 1 September, while the list of toll roads will also be extended, warns National Toll Payment Services Ltd.

You can read this article in 4 minutes

From 16th August 2024, a Hungarian government decree will amend the fines associated with unauthorised road use.

The revised fines, determined according to vehicle categories and the duration following a penalty event, are as follows:

Vehicle category 0-120 minutes after starting the journey 121-240minutes after starting the journey 241-480 minutes after starting the journey
Failure to pay the toll before starting to use the road
J2 47 000 Ft 140 000 Ft 218 000 Ft
J3 55 000 Ft 156 000 Ft 234 000 Ft
J4 62 000 Ft 172 000 Ft 257 000 Ft
J5 70 000 Ft 187 000 Ft 281 000 Ft
Vehicle declared for a lower fee or environmental category
J2 37 000 Ft 112 000 Ft 172 000 Ft
J3 44 000 Ft 125 000 Ft 187 000 Ft
J4 56 000 Ft 137 000 Ft 211 000 Ft
J5 62 000 Ft 150 000 Ft 234 000 Ft
On-board unit on the register of invalidated equipment at the time of road use.
J2 47 000 Ft 140 000 Ft 218 000 Ft
J3 55 000 Ft 156 000 Ft 234 000 Ft
J4 62 000 Ft 172 000 Ft 257 000 Ft
J5 70 000 Ft 187 000 Ft 281 000 Ft

The categories are defined as follows:

  • J2 includes two-axle vehicles, 
  • J3 includes three-axle vehicles, 
  • J4 includes four-axle vehicles, 
  • and J5 includes vehicles with five or more axles.

Moreover, the Hungarian government has announced significant amendments to the toll regulations in Hungary, effective from 1st September 2024. These changes, outlined in the Minister of Construction and Transport’s Regulation 23/2024 (VII. 31.) and building on the earlier Regulation 25/2013, will impact vehicles with a maximum permissible total weight of over 3.5 tonnes.

The main changes are that new sections of road will be included in the toll payment system and the toll boundaries of some existing sections will be changed. 

The new toll sections to be included from 1st September 2024 are:

  • M6 motorway: section between Mohács and Lippó (km 191-208, 16.5 km)
  • M44 motorway: section between Szentkirály and Lakitelek (km 24-30, 5.5 km)
  • Main road 23: bypass around Bátonyterenye (km 0-2, 2 km)
  • Main road 260: Sajószentpéter–Berente bypass section (km 0-10, 10 km)
  • Main road 451: section between Szentes and Orosháza (km 46-77, 22.5 km)
  • Main road 512: section between the M6 motorway and Kalocsa (km 0-17, 17 km)

Additionally, technical amendments necessary for the automatic inflation tracking of the basic infrastructure fee rate will be implemented.

Tags